Quality Assurance & Daily Verification

QA/QC System Active

Daily QA/QC work verification checklists, consultant approvals, snag logs, and milestone quality sign-offs.

Total Inspections

1

Project P875

First-Time Pass Rate

100%

Consultant Benchmark: 90%

Active Defects

0

Snag List Items

Closed & Certified

1

QA Sign-Offs

Inspection Checklists & Verification Records

Showing 1 of 1 records

1 Reports
QI-2026-0199Ref WO: WO-2026-P875-0158PASSVERIFIED_AND_CLOSED

IPT Level 3 West Ward Ceiling & Joinery

Doha Interior Solutions

IPT-L3-West • 2026-09-08 14:00

Checklist Items (3)
Ceiling grid alignment and seismic wire bracing
Antimicrobial surface coating compliance test
Negative pressure boundary airtight seals

Defect Observation: All ceiling tiles level and securely clipped.

Inspector: Eng. Ahmed Al-Bishri (KEO Senior Quality Assurance Engineer) Signed & Verified