7 Total Permits
1 Active / Whitelisted
Phase 1: Preparation
Stages 1, 2
2
WO-2026-P875-0151Stage 2

OPT Level 3 Imaging Suite Lead Shielding

Imaging Suite Shielding · Qatar Structural Steel

2/14
WO-2026-P875-0164Stage 1

IPT Hoarding Chokepoint Negative Pressure Survey

Hoarding Chokepoint (Clinical Interface) · Al Sraiya MEP Engineering

0/6
Phase 2: Review & Approvals
Stages 3, 4, 5
2
WO-1027Stage 5

IPT Level 3 East Medical Infrastructure & Electrical Installation

East Ward Mechanical & Medical Gas Refit · Al Sraiya MEP Engineering

6/20
WO-2026-P875-0148Stage 3

OPT Level 2 Clinic Block B Ductwork

Clinic Block B Fit-Out · Al Rayyan HVAC

2/22
Phase 3: Workforce & Gates
Stages 6, 7
2
WO-2026-P875-0142Stage 6

IPT Level 3 Medical Gas Piping Installation

East Ward Mechanical & Medical Gas Refit · Electro-Mechanical Enterprise

4/25
WO-2026-P875-0143Stage 6

IPT Level 5 West Riser Cable Pulling

West Wing Riser Works · Al Sraiya MEP Engineering

3/18
Phase 4: Active Execution
Stages 8, 9
0
No active permits in this phase
Phase 5: Verification & Close
Stages 10, 11, 12
1
WO-2026-P875-0158Stage 10

IPT Level 3 West Ward Ceiling & Joinery

West Ward Wing Finishing · Doha Interior Solutions

2/20
WO-1027Stage 5 of 12 · Approved

IPT Level 3 East Medical Infrastructure & Electrical Installation

Al Sraiya MEP Engineering · East Ward Mechanical & Medical Gas Refit · Supervised by Tariq Al-Masri (+974 5512 8841)

State Machine Lifecycle Progress42% Complete
SG-WO1027-TOKEN-8839-AUTH

Scan via Worker Mobile Terminal to unlock toolbox briefing, sign safety acknowledgements, and grant turnstile access.

SITE GUARDIAN FIELD TERMINALP875-PTW-SYNC

IPT Level 3 East Medical Infrastructure & Electrical Installation

Conduit routing, medical gas pipeline hookups and secondary busway installation in IPT Level 3 East Ward under ICRA Class IV isolation.

Mandatory Hazards & Controls

Hot worksPressurised medical gasWorking at heightICRA infection barrier breach risk
Required PPE: Safety Helmet, Hi-Vis Reflective Vest, Steel-toe Boots, Safety Goggles, FFP2 Dust Mask

Supervisor / Worker Electronic Sign-Off